• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Oilpatch fears delays as U.S. judge orders further review of KXL pipeline route

August 16, 201812:29 PM The Canadian Press0 Comments

CALGARY – Potential delays in the completion of the Keystone XL pipeline following a U.S. judge’s order mean that Western Canadian oil producers could suffer current price discounts for a longer period of time, an industry spokesman says.

On Wednesday, U.S. District Court Judge Brian Morris ordered additional environmental study of the altered route through Nebraska for TransCanada Corp.’s proposed pipeline.

The potential setback illustrates how difficult it has become to relieve market access woes that have resulted in larger-than-usual price discounts for Western Canadian crude, said Chris Bloomer, CEO of the Canadian Energy Pipeline Association.

“We need the pipeline, we need it yesterday and we need more market access across the board,” he said in an interview.

“We’re not getting a fair price for our crude in the U.S. because of a lack of capacity. That’s just fundamentally an issue.”

The difference between Western Canadian Select and New York benchmark West Texas Intermediate crude was about US$25 per barrel on Wednesday, down from peaks over US$30 earlier this year but higher than historic averages in the mid-teens.

Crude-by-rail exports from Canada reached an all-time record high of 199,000 barrels per day in May, up from about 131,000 bpd in May 2017, despite higher costs and a poorer safety record than pipeline shipments, Bloomer pointed out.

The U.S. lawsuit was brought by plaintiffs including the Indigenous Environmental Network and Northern Plains Resource Council after Nebraska state authorities approved an alternative route to the one TransCanada had proposed through the state.

The groups argued the U.S. State Department violated several acts in issuing a presidential permit for the pipeline without a proper environmental assessment of the changed route, but the judge rejected their request to revoke the permit issued by Donald Trump soon after he took office last year.

TransCanada spokesman Terry Cunha said the company was studying the ruling and had no immediate comment.

Environmental groups cheered the decision and called for TransCanada, which has not officially sanctioned the project, to abandon it.

“Today’s ruling is a victory for clean water, climate, and communities that would be threatened by the Keystone XL pipeline,” Sierra Club senior attorney Doug Hayes said in a news release.

“This proposed project has been stalled for nearly a decade because it would be all risk and no reward, and despite the Trump administration’s efforts, they cannot force this dirty tar sands pipeline on the American people.”

The proposed 1,897-kilometre, $10-billion Keystone XL pipeline would carry crude from Hardisty, Alta., to Steel City, Neb.

Two other export pipelines, the expansion of the Trans Mountain pipeline being sold to the federal government and Enbridge Inc.’s Line 3 pipeline replacement, also face uncertainty.

In 2017, Canada’s oil supply was 4.2 million bpd, which exceeded existing available pipeline capacity, according to the Canadian Association of Petroleum Producers.

In June, CAPP predicted total Canadian oil production will increase to 5.6 million bpd by 2035 mainly due to a rise in oilsands production to 4.2 million bpd from 2.65 million bpd in 2017.

Follow @HealingSlowly on Twitter.

Companies in this story: (TSX:TRP, TSX:ENB)

Enbridge Keystone XL Trans Mountain Pipeline TransCanada

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • A new era of oil sands growth
  • Alberta expects oil sands investment “immediately” following new royalty regime changes, finance minister says
  • Discount on Western Canada Select narrows
  • Alberta implementing new oil royalty payment system to encourage production
  • Alberta cuts oil sands fees with new 10-year royalty regime for new projects

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.