• Sign up for the Daily Digest E-mail
  • Facebook
  • X
  • LinkedIn

BOE Report

Sign up
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Fire next door to B.C. pipeline fuel tank facility won’t be investigated

January 20, 20193:13 PM The Canadian Press0 Comments

BURNABY, B.C. – The Burnaby Fire Department says it won’t be conducting an investigation into a fire Saturday night a few hundred metres from a Kinder Morgan fuel tank facility in Metro Vancouver.

Assistant Fire Chief Stewart Colbourne says the fire was in a garage or storage area and the building was fully consumed, so the department won’t be able to figure out the cause.

On Saturday, Deputy Chief Dave Samson said the department was called to the blaze in a large equipment storage facility used by a demolition business.

The building is in a property bordering a narrow greenbelt at the edge of the Kinder Morgan facility, where 13 huge tanks hold crude oil and refined products awaiting distribution.

The facility can hold up to 1.6 million barrels of fuel.

Kinder Morgan is planning to expand the site, doubling the number of storage tanks, in preparation for the planned expansion of the Trans Mountain pipeline which ends at the facility on the Burrard Inlet.

Kinder Morgan Trans Mountain Pipeline

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Continental Resources says Argentina shale resource could be ‘another Permian’
  • Axiom Oil and Gas Inc. – Property Divestiture
  • InPlay Oil Corp. Announces 2026 Capital Budget
  • US and China hold the keys to containing a Mideast oil shock: Bousso
  • Oil majors running Kazakh Kashagan field file arbitration over $4.6 billion fine

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.