• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Alberta NDP’s Notley promises $1.4B to expand network of roads for heavy loads

March 27, 20191:26 PM The Canadian Press0 Comments

FORT MCMURRAY, Alta. – NDP Leader Rachel Notley is promising to spend $1.4 billion to expand Alberta’s network of roads that handle large and oversized loads.

Notley says the current 6,500-kilometre network is recognized as one of the best in North America, but more needs to be done.

She says a re-elected NDP government would work to increase the network to cover 10,000 kilometres over the next six years.

Notley says loads such as oil and gas equipment and prefabricated houses would move much faster, saving time and money.

It was one of two new NDP platform announcements in Fort McMurray today ahead of the April 16 election.

Notley is also committing to build a secondary highway out of the oilsands city to ease congestion and to give residents an alternative escape route in an emergency.

She says people will never forget how residents were forced to flee down Highway 63 through a tunnel of flames as a raging forest fire torched parts of the municipality in 2016.

The opposition United Conservatives have said they would explore user-pay initiatives, such as tolls, to help pay for new industrial infrastructure such as heavy-load roads.

The UCP has said it wouldn’t toll existing infrastructure.

The party has said with the provincial debt climbing to close to $60 billion, the government has to look at other financing options.

Notley reiterated Wednesday that an NDP government will not pass the costs on to road users.

“We’re going to keep Alberta toll-free,” said Notley.

— By Dean Bennett in Edmonton

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Discount on Western Canada Select unchanged
  • US loans 8.5 million barrels of SPR oil in second batch since Iran war
  • US drillers cut oil and gas rigs for third time in four weeks, Baker Hughes says
  • UK to convene more talks on Strait of Hormuz next week, official says
  • Ovintiv to Host its First Quarter 2026 Results Conference Call and Webcast on May 12, 2026

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.