• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Alberta premier wants direct compensation from U.S. if Keystone XL pipeline dead

January 22, 202111:56 AM The Canadian Press0 Comments

Alberta Premier Jason Kenney

EDMONTON – Alberta Premier Jason Kenney is making another demand of Justin Trudeau over the Keystone XL pipeline ahead of the prime minister’s call today with new U.S. President Joe Biden.

In a letter to Trudeau, Kenney reiterates that the prime minister must press for a meeting with Biden so that Canada can make its case for the pipeline, which Biden cancelled this week on his first day in office.

Kenney also repeats that if that fails, Trudeau must take retaliatory measures such as trade sanctions.

But he also asks that Trudeau press Biden for direct compensation.

Kenney says Alberta and pipeline builder TC Energy Corp. invested in the project believing it was going ahead under stable review and governance.

The premier committed $1.5 billon to the project last year, with another $6 billion in loan guarantees.

Biden made it clear last spring that he would cancel the Keystone line if he became president. He said that shipping more product from Alberta’s oilsands did not mesh with his broader objective of battling climate change.

The Keystone line would have taken more Alberta oil to refineries and ports in the United States to relieve a North American bottleneck that has led to discounts and sometimes sharp reductions in the price of Alberta’s oil.

In the letter dated Thursday, Kenney says the Keystone project that Biden once rejected is now a different, more environmentally friendly undertaking.

“Keystone XL will be the first pipeline of its kind to operate at net-zero emissions on its first day of operations and will purchase 100 per cent of its power load from renewable energy sources,” Kenney writes.

“I propose that we approach Washington together to begin a conversation about North American energy and climate policy.”

If that doesn’t happen, he is pushing for “proportionate economic consequences.”

“At the very least, I call upon the government of Canada to press the U.S. administration to compensate TC Energy and the government of Alberta for billions of dollars of costs incurred in the construction of Keystone XL to date.

“These costs were incurred on the assumption that the United States had a predictable regulatory framework and based on the presidential permit authorizing the Keystone XL border crossing, which was installed in the summer of 2019.”29dk2902l

Keystone XL TC Energy

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • New oil and gas jobs from BOE Report Jobs
  • Journey Announces Expansion to 2026 Capital Program, Increased Duvernay Drilling, and Provides Updated 2026 Production Guidance
  • Iran deal includes $300 billion fund, more than half of which already committed, source says
  • Hanwha Ocean Signs Strategic Memorandum of Understanding with Kanata Clean Power for Proposed Floating LNG Project in Canada
  • Lower costs see oil sands emerge as one of North America’s most attractive plays

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.