• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Enbridge fails to meet aquifer cleanup deadline in Minnesota

October 18, 20217:05 AM The Canadian Press0 Comments

Enbridge pipeline

MINNEAPOLIS (AP) — Enbridge has failed to meet a deadline set by the Minnesota Department of Natural Resources for cleaning up a site where an aquifer ruptured during construction of the Line 3 oil pipeline, DNR officials said.

The agency had given the company until Friday to repair the damage that caused the artesian aquifer near Clearbrook to leak at least 24 million gallons of groundwater. Regulators will require compensation for the additional time it takes to stop the groundwater flow.

The DNR has already ordered Enbridge to pay $3.32 million for failing to follow environmental laws.

Regulators also announced they are investigating two separate sites where the company may have caused additional groundwater damage, the Star Tribune reported.

A company spokeswoman says Enbridge is co-operating with the Minnesota DNR to correct uncontrolled groundwater flows at Clearbrook, and is working with officials while they evaluate two other locations.

Line 3 starts in Alberta, Canada, and clips a corner of North Dakota before crossing Minnesota en route to Enbridge’s terminal in Superior, Wisconsin.

Winona LaDuke, who heads the Honor the Earth Indigenous environmental group, called the company’s failure to meet the deadline alarming. “If Enbridge can’t meet basic safety requirements, they should not be allowed to operate a pipeline,” she said, adding that it “doesn’t bode well for the future.”

Enbridge

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Iran says new sanctions threatened by ‘desperate’ US will fail
  • Iran grants permission for a number of Iraqi oil tankers to pass through Hormuz
  • US, Iran keep up hostile rhetoric ahead of new sanctions
  • Trump says Iran not ready to make the ‘right deal’
  • Studies show year-round shipping potential from Port of Churchill

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.