• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Enbridge exploring low-cost expansions to get around pipeline delays

February 20, 201510:51 AM The Canadian Press

Enbridge Inc. (TSX:ENB) says it’s exploring a number of low-cost expansions to its pipeline infrastructure to keep crude oil moving while various larger-scale pipeline proposals remain mired in legal and regulatory delays.

“All of these involve relatively small, low cost, bolt-on projects that can be staged in increments as required to meet shipper needs,” Guy Jarvis, the company’s president of liquids pipelines, said during a conference call Friday.

“For that reason, we think that they will be attractive in a lower (oil) price, lower supply scenario, or even just in the face of greater uncertainty about oil prices.”

The company is considering is an expansion to the refining area on the eastern Gulf Coast. One of its options would be to revive a project that was first announced in 2013 and expected to be in service this year. the Trunkline project would involve reversing an existing stretch of pipeline that runs between Patoka, Ill., and St. James, La. that is owned by Texas-based Energy Transfer Partners LP.

“The project didn’t succeed because we were unable to secure customer support for it at that time, in the face of other options that customers had available for them to get to new and different markets,” Jarvis said.

He said the company is now revisiting the project and exploring several other small expansions in light of the decline in crude prices and the delays facing larger pipeline projects.

Many oil producers in Western Canada have been relying on railways to transport crude while waiting on the start of pipeline projects, such as TransCanada’s (TSX:TRP) Keystone XL, which would connect Canada’s tar sands to refineries on the U.S. Gulf Coast. TransCanada has been trying for six years to get U.S. approval for the 1,179-mile (1,897-kilometre) project that President Barack Obama has threatened to veto.

Jarvis says that transporting crude by rail is costlier than sending it through a pipeline and, given the recent drop in the commodity’s value, lower-cost alternatives have become more attractive.

Jarvis’s comments follow the Calgary-based company’s announcement Thursday of a fourth-quarter profit of $88 million, or 10 cents per diluted share.

That’s a significant change from a year ago, when Enbridge reported a net loss of $267 million or 33 cents per share as it took a hedging loss in its energy services division.

Revenue grew to almost $8.8 billion from $8.29 billion, the company said after markets closed Thursday.

Adjusted quarterly earnings were $409 million or 49 cent a share, compared with $362 million or 44 cents per share in the prior-year period.

Follow @alexposadzki on Twitter

Enbridge

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Brent oil tops $90 as US, Iran intensify attacks in Middle East
  • Few tankers enter Hormuz to load oil, data shows
  • Kuwait condemns what it calls Iranian attack on power, water desalination facility
  • Caspian Pipeline Consortium oil loadings suspended after drone attacks on tankers, CPC says
  • Iran’s Supreme Leader says US breaches show Trump’s signature is ‘worthless’

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.