• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Primeline Mobilizes Rig for Drilling Operations

September 16, 201512:02 PM Marketwired

HONG KONG, CHINA–(Marketwired – Sept. 16, 2015) –

NOT FOR DISTRIBUTION TO U.S. NEWS WIRES SERVICES, OR DISSEMINATION IN THE UNITED STATES.

Primeline Energy Holdings Inc. (“Primeline” or the “Company”) (TSX VENTURE:PEH) today announced that its drilling contractor China Oilfield Service Ltd. (COSL) has started the mobilization of the rig for the drilling operation of LS23-1-1 well.

Following the signing of the drilling contract by Primeline with COSL as announced on August 17, 2015, COSL has completed the site survey of the well locations and other preparations for the drilling operations, including the applications for the required operation permits. Primeline held a pre-spud meeting with COSL and all main subcontractors on September 14. COSL started to tow drilling rig HYSY941 toward the well LS23-1-1 location on the evening of September 15. The towing operation is expected to last three to five days, subject to weather and sea conditions, followed by jack up, with drilling operations expected to commence around September 22.

The COSL HYSY941 is a self-elevating jack up rig built in 2006 by Dalian Shipbuilding. The rig has a maximum drilling depth capacity of 9,150 m and is capable of operating in up to 122 m water depth. The rig can accommodate 145 personnel and has full international certifications.

An update will be announced when drilling commences.

About Primeline Energy Holdings Inc.

Primeline is an exploration and production company focusing exclusively on China natural resources to become a major supplier of gas and oil to the East China market. Primeline has a 100% Contractor’s interest in, and is the operator of, the petroleum contract with CNOOC for Block 33/07 (5,877 sq km) and a 49% interest in the producing LS36-1 gas field in Block 25/34, together with CNOOC (51% interest and acting as Operator. Both blocks are located in the East China Sea. LS36-1 has been in production since July 2014. Shares of Primeline are listed for trading on the TSX Venture Exchange under the symbol PEH.

ON BEHALF OF PRIMELINE ENERGY HOLDINGS INC.

Ming Wang, Chief Executive Officer

Please visit the Company’s website at www.pehi.com. Should you wish to receive Company news via email, please email nadine@chfir.com and specify “Primeline Energy” in the subject line.

Forward-Looking Statements

Some of the statements in this news release contain forward-looking information, which involves inherent risk and uncertainty affecting the business of Primeline. Although these statements are based on assumptions management believes to be reasonable, actual results may vary from those anticipated in such statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Primeline Energy Holdings Inc.
Dr. Ming Wang
CEO
+44 207.499.8888 or Toll Free: 1.877.818.0688
+44 207.499.2288 (FAX)
IR@pehi.com
www.pehi.com

CHF Investor Relations
Cathy Hume
CEO
+1 416.868.1079
cathy@chfir.com

VSA Capital Limited
Andrew Raca
Head of Corporate Finance
+44 203 005 5000
ARaca@vsacapital.com

CNOOC

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • What is Alaska LNG and why does the project face doubts?
  • Gulf crude oil exports return to 2025 level, Goldman Sachs says
  • How the US controls Iraq’s oil revenues
  • New oil and gas jobs from BOE Report Jobs
  • Trump set to tout Korean investment in Alaska LNG, other projects

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.