• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

NCS Multistage Places Record 14.1 Million lb of Proppant in a Permian Basin Coiled-Tubing Frac

October 14, 20156:00 AM Business Wire

HOUSTON–(BUSINESS WIRE)–NCS Multistage, LLC, placed 14.1 million lb (6,395 t) of proppant in a 52-stage completion in the Permian Basin, a world record for completions using coiled tubing and single-point frac injection. The completion took only five days and was accomplished in a single coiled-tubing trip using NCS’ Multistage Unlimited frac-isolation system.

Tim Willems, NCS Multistage Chief Operating Officer, said, “This job demonstrated the robustness and efficiency of our coiled-tubing frac system. Fourteen million pounds is a lot of proppant for any kind of multistage completion, and we were able to execute it with a single tool in a single coiled-tubing trip. Just as important, we recorded downhole pressure and temperature data that is proving valuable for evaluating this completion and for optimizing subsequent completions in the formation.”

The Multistage Unlimited system combines cemented casing sleeves, which are installed as part of the casing string, with a completion tool assembly that locates each sleeve, isolates it from the wellbore below, and shifts it open for fracturing. Proppant and frac fluid are pumped down the annulus between the coiled tubing and the casing.

About NCS Multistage

NCS Multistage, LLC, is the world leader in coiled-tubing-deployed fracturing technology used in multistage completions. The independent technology and services company has operated throughout the United States, Canada, Mexico, Argentina, Australia, China, and Russia, with a record of more than 6,000 field successes. The company is headquartered in Houston, Texas. More information is available at ncsmultistage.com.

Permian

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Saudi says it intercepted 2 drones launched by Houthis towards Riyadh
  • Venezuela’s promised elections face long delays, sources say
  • Iran’s Araqchi says now up to US to accept 7-day plan
  • Oil prices slide about 2% as US, Iran explore path out of war
  • US energy firms add rigs for third week to highest since 2024, says Baker Hughes

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.