• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Enbridge stands ground, tells National Energy Board that Line 9 design is safe

October 24, 20146:09 AM The Canadian Press0 Comments

CALGARY – Enbridge Inc. (TSX:ENB) insists in a regulatory filing that its design for the Line 9 pipeline through southern Ontario has the right shut-off valve configuration to minimize the risk to waterways and reservoirs in the event of a rupture.

The Calgary-based company was responding to the National Energy Board’s decision to delay a restart of the pipeline because it’s “not persuaded” that Enbridge has met one of the the conditions attached to the NEB’s approval of the project.

Line 9 had been targeted to begin shipping western crude eastward through southern Ontario to Montreal in early November but the NEB said in a Oct. 6 letter that approval would be withheld until its concerns over shut-off valves were addressed.

In an Oct. 23 response, Enbridge told the NEB that the company has met or exceeded the safety standards but may have failed to explain its highly technical approach adequately to the regulator.

Most of the eight-page letter is devoted to explaining how Enbridge took the best approach by considering a combination of factors such as the elevation of the pipeline’s route when deciding where to place shut-off valves.

“It has become evident to us that key aspects of our valve placement methodology were not clearly conveyed,” said the letter from Guy Jarvis, Enbridge’s president for liquids pipelin, to the Calgary-based National Energy Board.

“Enbridge’s conservative approach to risk management and valve placement is designed to ensure we not only meet, but exceed, regulatory standards. Our IVP (Intelligent Valve Placement) methodology applies competent engineering judgment and sound engineering practices to reduce potential release volumes to the lowest level reasonably practical along the entire pipeline. In doing so, it helps protect the public and the environment in the unlikely event of a pipeline release.”

Line 9 is a 40-year-old pipeline that’s part of a larger Enbridge plan to transport more crude from Western Canada to refineries in Eastern Canada and potentially to export markets. The Line originally flowed in a west-to-east direction in the 1970s, but that was reversed in the late 1990s in response to changing market conditions and is being reversed again.

Although the company insists Line 9 has operated safely throughout its history, there’s been local opposition to Enbridge’s plans to ship more oil eastward due to concern about the risk of a major spill into water supplies.

In its Oct. 6 letter, the NEB said it appeared that Enbridge hadn’t complied with some of the conditions imposed by the regulator and said the company had to address the board’s concerns before applying for final permission.

Enbridge Line 9

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Discount on Western Canada Select unchanged
  • US loans 8.5 million barrels of SPR oil in second batch since Iran war
  • US drillers cut oil and gas rigs for third time in four weeks, Baker Hughes says
  • UK to convene more talks on Strait of Hormuz next week, official says
  • Ovintiv to Host its First Quarter 2026 Results Conference Call and Webcast on May 12, 2026

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.