• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Imperial Oil’s Kearl oilsands operation to suspend production for several weeks

November 11, 20144:46 AM The Canadian Press0 Comments

CALGARY – Imperial Oil Ltd. (TSX:IMO) says its Kearl oilsands project will be shut down for several weeks as a precaution while the company deals with an equipment malfunction.

Imperial says it will install replacement parts to deal with vibration detected at Kearl’s ore-crusher unit.

It didn’t provide an estimate about how much production will be lost during that period or provide a target date for a startup.

Kearl had been producing about 92,000 barrels per day on average through the third quarter, excluding the impact of a 14-day shutdown in September.

It was designed to produce up to 110,000 barrels per day but hasn’t reached that level since startup 18 months ago.

The oilsands operation — about 70 kilometres north for Fort McMurray — is a joint venture between Imperial Oil and its parent, Exxon Mobil Corp., which owns a majority of the Canadian company’s stock.

Kearl was built at a cost of $12.9 billion — $2 billion over its previous estimate.

The company met legal and regulatory delays in bringing the enormous pieces of South Korean-made equipment to the mine site, which were shipped across the Pacific and then through the United States and Canada by river barge and truck.

The 200 modules had to be broken up into smaller pieces so they could be transported along highways in Idaho and Montana and then put together again near Edmonton.

Imperial Oil

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Brent oil tops $90 as US, Iran intensify attacks in Middle East
  • Few tankers enter Hormuz to load oil, data shows
  • Kuwait condemns what it calls Iranian attack on power, water desalination facility
  • Caspian Pipeline Consortium oil loadings suspended after drone attacks on tankers, CPC says
  • Iran’s Supreme Leader says US breaches show Trump’s signature is ‘worthless’

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.