CALGARY, ALBERTA–(Marketwired – Aug. 7, 2015) – RMP Energy Inc. (“RMP” or the “Company“) (TSX:RMP) was informed by Alliance Pipeline of the shutdown of its mainline pipeline system and as a result requested natural gas suppliers to suspend pipeline injections for an indeterminate period of time. As such, RMP has been directed to suspend sales gas injection into the Alliance Pipeline commencing this morning, August 7, 2015. This temporary suspension will result in the shut-in of substantially all of RMP’s production, including its light oil, until the situation is resolved. The Company intends to use this temporary outage event to conduct maintenance activities of its production and processing facilities.
RMP will provide further updates as additional information becomes available.
RMP ENERGY INC.
John Ferguson
President and Chief Executive Officer
(403) 930-6303
john.ferguson@rmpenergyinc.com
RMP ENERGY INC.
Dean Bernhard
Vice President, Finance and Chief Financial Officer
(403) 930-6304
dean.bernhard@rmpenergyinc.com