• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Alberta Energy Regulator orders Nexen to suspend operations on 95 pipelines

August 28, 20157:17 PM The Canadian Press

CALGARY – Alberta’s energy regulator has ordered Nexen Energy to immediately cease operations of 95 pipelines in northeastern Alberta.

It issued the order late Friday due to what it calls non-compliance surrounding pipeline maintenance and monitoring in its Long Lake oilsands project.

Alberta Energy Regulator spokesman Bob Curran said every oil and gas company is required to monitor, inspect and maintain records for all of their pipelines.

Nexen couldn’t demonstrate that those activities have occurred on those lines, which carry several products including crude oil, natural gas, salt water, fresh water and emulsion, Curran said.

“What we need from them now is that assurance that those lines have been properly checked and that they are in compliance with the Pipeline Act.”

Until then, the pipelines will stay shut, Curran added.

On July 15, a pipeline at Nexen’s Long Lake project about 35 kilometres southeast of Fort McMurray, Alta., was found to be leaking. Nexen shut it down soon after, but not before about five million litres of a mixture of bitumen, bitumen, produced water and sand spilled into muskeg.

The company, which was taken over by China’s CNOOC Ltd. in 2013, said the affected area was about 16,000 square metres along the pipeline’s route.

Curran said Nexen provided the AER with a letter on Tuesday as part of the investigation into the July leak.

“When we’re investigating, we require certain information and access to certain records from the company so in this case they provided us a letter that indicated they did not have the documentation we are looking for or that the required activities did not occur,” Curran said.

Jim Ellis, president and CEO of the AER said public safety and the environment are top priorities.

“Given that this company has already had a pipeline failure at this site, the AER will not lift this suspension until Nexen can demonstrate that they can be operated safely and within all regulatory requirements,” Ellis said in a news release.

“We will accept no less than concrete evidence.”

A spokeswoman for Nexen said she could not immediately comment.

CNOOC Nexen

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Iran will halt attacks as long as US maintains pause, Iranian source says after Trump calls off strikes
  • Five things to watch for in the Canadian business world in the coming week
  • Iran war spreads to Red Sea and Caspian, Gulf quiet as US forgoes strikes
  • Missiles targeting Saudi oil refineries shot down, sources say
  • Kuwait’s KPC signs $16 billion lease and leaseback deal for oil pipeline network

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.