• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Keystone pipeline down longer than expected as crews look for source of leak

April 7, 20167:21 AM The Canadian Press0 Comments

CALGARY – TransCanada says about 63,600 litres of crude oil leaked from its Keystone pipeline in southeastern South Dakota and that it continues to investigate the incident.

The Calgary-based company (TSX:TRP) says its spill estimate is based on the excavation of soil covering more than 30 metres of pipe around the spill site, about 60 kilometres southwest of Sioux Falls.

Company spokesman Mark Cooper says they still have not identified the source of the leak.

With the investigation and cleanup continuing, TransCanada says it doesn’t expect to reopen the pipeline until at least early next week rather than the end of this week as previously indicated.

The company says a crew of about 100 is on site to clean up the spill, which covers an area of about three metres by nine metres, and that there doesn’t appear to have been significant environmental damage.

Warren Mabee, an energy policy expert at Queen’s University, says while not insignificant, the spill is relatively small for a pipeline leak and the fact it’s not near a waterway or ecologically sensitive area helps reduce the impact.

“This is a relatively minor issue and it’s not going to in and of itself create a huge problem,” said Mabee.

But while the environmental impact is not big, Mabee says the incident will have a much greater impact on future pipeline debates.

“What it does do is it reinforces this mind set in the public that pipelines are something to watch, they’re not 100 per cent safe, that we should be thinking about it as we go and look at new pipeline projects.”

“This creates a real challenge for a company like TransCanada, which I think does try very hard to be as proactive as they can with pipeline safety,” he said.

He said TransCanada will also have to look at its practices and leak monitoring systems to determine why it didn’t detect the leak.

TransCanada was alerted to the problem on Saturday by a farmer and quickly shut down the pipe to prevent further oil escaping.

The Keystone pipeline — in service since 2010 — can handle 590,000 barrels of crude per day and is a major route for Alberta oil on its way to refineries in Illinois and Oklahoma.

TransCanada

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Iran has not decided to resume US talks, says Hormuz shipping depends on US meeting conditions
  • Iran defiant on strait as Trump tells Americans to accept high gas prices
  • UAE’s ADNOC says one of its vessels came under attack while transiting Hormuz
  • Iran’s deputy foreign minister says won’t be intimidated by US threats after Trump’s statements on Hormuz
  • Peyto Exploration & Development Corp. Confirms Monthly Dividend for September 15, 2026

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.