• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Regulator says new rules will eliminate toxic oilsands tailings ponds

July 14, 20163:16 PM The Canadian Press0 Comments

CALGARY – The Alberta Energy Regulator has introduced new rules that it says will ultimately remove unsightly and toxic tailings ponds from the oilsands mining region of northeastern Alberta.

CEO Jim Ellis says companies with tailings ponds will face new reporting and progressive reclamation requirements, with all ponds required to be ready to be reclaimed within 10 years of the end of a mine’s life.

The AER’s new directive replaces tailings ponds regulations, put in place in 2009, that industry claimed it couldn’t comply with. AER spokeswoman Tracie Moore says the earlier directive was suspended in March of 2015 and has now been rescinded.

Alberta Energy estimated oilsands mining projects had created about 220 square kilometres of tailings ponds by the end of 2013. The ponds are used to store water needed to separate heavy bitumen crude from sand and other impurities and contain water, silt, leftover bitumen and solvents. They have long been one of the industry’s toughest environmental challenges.

Under the new rules, operators are required to submit fluid tailings management applications to the AER by Nov. 1. The applications are to be reviewed over the winter and a second version of the directive, with updated surveillance and compliance processes, is to be finalized by next spring.

Ellis says the new directive is based on consultation with a committee made up of oilsands operators, First Nations, Metis communities, oilsands region municipal officials and environmental organizations.

Note to readers: Corrections Clarifies wording in para 2; “required to be ready to be reclaimed”

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Iran grants permission for a number of Iraqi oil tankers to pass through Hormuz
  • US, Iran keep up hostile rhetoric ahead of new sanctions
  • Trump says Iran not ready to make the ‘right deal’
  • Studies show year-round shipping potential from Port of Churchill
  • US energy firms cut rigs for first time in four weeks, says Baker Hughes

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.