• Sign up for the Daily Digest E-mail
  • Facebook
  • Twitter
  • LinkedIn

BOE Report

Sign up
  • Home
  • Headlines
    • Latest Headlines
    • Columns
    • Discussions
  • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts
    • CAODC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
  • Industry Data
    • Canada Well Licences
    • USA Market Data
    • Data Subscription
  • Jobs

QuickFacts: What you need to know about Enbridge’s Line 3 pipeline project

November 29, 201612:26 PM The Canadian Press0 Comments

CALGARY – A quick look at the Line 3 oil pipeline replacement project proposed by Enbridge (TSX:ENB):

Estimated Cost: $7.5 billion

Route: 1,660 kilometres between Hardisty, Alta., to Superior, Wisc. Crosses through Saskatchewan, Manitoba, North Dakota and Minnesota.

Capacity: Would restore the pipeline’s original regulated capacity of 760,000 barrels of oil per day and allow for further expansion to 915,000 barrels per day. The line is almost half a century old and its regulated maximum output has been reduced to about 390,000 barrels per day. The oil goes to refinery markets in Chicago, the U.S. Gulf Coast and the Eastern U.S. and Canada.

Background: In April, the National Energy Board recommended approval of the Canadian part of the project with 89 conditions. Line 3 already has a U.S. presidential permit but still requires state regulator approvals.

Note to readers: This is a corrected story. A previous version said Line 3 would be Enbridge’s most expensive project.

Enbridge

Follow the BOE Report
  • Facebook
  • Twitter
  • LinkedIn
Sign up for the BOE Report Daily Digest E-mail
Latest Headlines
  • Precision Drilling CEO says Canadian and U.S. GHG targets are ‘extremely aggressive”
  • Crude-by-rail exports fall by 43 per cent to 111,900 bpd in February, says regulator
  • Hostile takeover target Inter Pipeline reports 60% of Heartland plant is contracted
  • EverGen announces acquisition of B.C.’s original RNG facility
  • Column: “Hey! You can’t just run away like that. Can you?”

Return to Home
Alberta Gas
CAD/GJ
Market Data by TradingView





    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    Resources
    • App
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contribute
    • Contact
    • Report Error
    Featured In
    • CamTrader
    • Rigger Talk
    Data Partner
    • Foxterra
    BOE Network
    © 2021 Grobes Media Inc.