• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

QuickFacts: What you need to know about Enbridge’s Northern Gateway project

November 29, 201612:52 PM The Canadian Press0 Comments

CALGARY – A quick look at the Northern Gateway project proposed by Enbridge (TSX:ENB):

Estimated Cost: $7.9 billion

Route: 1,177 kilometres from Bruderheim, northeast of Edmonton, to a tanker port in Kitimat on the northern coast of B.C.

Capacity: A westbound pipeline would ship up to 525,000 barrels of oil per day to Kitimat for export to Asian markets. A second pipeline heading east would carry 193,000 barrels per day of natural gas condensate, which is used to dilute the molasses-like oilsands bitumen to allow it to flow. A terminal would be built in Kitimat that would include two ship berths and 19 storage tanks for oil and condensate. The terminal would have the capacity to serve about 220 tankers per year.

Background: The National Energy Board ruled in December 2013 that Northern Gateway was in the national interest, subject to 209 conditions. The previous federal Conservative government approved the project in 2014. But this past June, the Federal Court of Appeal overturned that decision, concluding that the government had failed in its duty to consult with aboriginal people.

Enbridge Northern Gateway

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Strait of Hormuz would remain under Iran’s management, Iran’s Fars says
  • Trump says Iran peace deal is ‘largely negotiated’ 
  • Trump says negotiators are getting closer to Iran deal, media interviews show
  • Iran says Hormuz mechanism should be agreed with coastal states, not US
  • BP’s Whiting Refinery offers revised proposal to union in ongoing talks

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.