• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

B.C. appeal court rules against Burnaby in bylaw battle with Trans Mountain

March 27, 201712:15 PM The Canadian Press0 Comments

VANCOUVER – A legal battle between the City of Burnaby and the Trans Mountain pipeline expansion has ended with the British Columbia Court of Appeal ruling the National Energy Board can override municipal bylaws.

The fight began in 2014 when Trans Mountain was set to begin field studies on Burnaby Mountain, which required it to cut down trees, drill boreholes and operate heavy machinery — activities that violate the city’s bylaws.

Before beginning the field work, the company obtained a ruling from the energy board that confirmed it was allowed to conduct surveys and examinations on land in Burnaby without the city’s consent.

Burnaby didn’t appeal the energy board’s ruling, but when Trans Mountain began engineering studies on Burnaby Mountain in September 2014, the company was served with notices of bylaw violations.

The dispute ultimately wound up in B.C. Supreme Court, where Justice George Macintosh ruled in 2015 that the energy board has the constitutional power to direct or limit the enforcement of Burnaby’s bylaws.

A three-member panel of appeal court judges agreed in a decision on Monday, with Justice Lauri Ann Fenlon writing that the energy board had jurisdiction to resolve the conflict between Burnaby’s bylaws and the powers granted under the National Energy Board Act.

The city continues to oppose the $7.4-billion project, which would triple the capacity of the pipeline running from Alberta to Burnaby. In December, it filed an application with the Federal Court of Appeal for leave to appeal the federal government’s approval of the expansion.

Mounties arrested more than 100 people during protests in 2014 on Burnaby Mountain, but a judge later tossed out civil contempt charges against many of the activists who were arrested for violating a court injunction ordering them to stay away.

The company said it had provided the wrong GPS co-ordinates when it asked for the original court order and the measurements were so inaccurate that the site was outside the area covered by the injunction.

Trans Mountain Pipeline

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Alberta’s Smith says Canadians ‘confused’ by Trump’s targeting of Lake Ontario
  • Venezuela oil deal raises trouble not capital
  • Oil stocks in US Strategic Petroleum Reserve fall by 3.1 million barrels to lowest level since 1982 
  • A look at Iran’s Kharg Island and energy sector
  • International Petroleum Corporation Announces Results of Normal Course Issuer Bid and Updated Share Capital

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.