• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

New technologies dull but don’t cure Canada’s export oil pipeline headaches

April 10, 201812:52 PM The Canadian Press0 Comments

CALGARY – The potential cancellation of the Trans Mountain pipeline expansion is putting a spotlight on oilpatch innovations that might mitigate the need for export capacity as oilsands production rises.

But even the most ardent supporters of the new technologies agree Canada is going to need new pipeline space.

North West Refining president Ian MacGregor says his just-opened Sturgeon Refinery northeast of Edmonton will save 80,000 barrels per day of export pipeline space by converting 50,000 barrels per day of bitumen into diesel and returning 30,000 barrels per day of diluent to the local market.

He says the lack of pipeline space from Western Canada has driven down the price of bitumen, which improves refinery profit margins and is a positive factor in eventually expanding it — although expansion would increase production beyond the local need and, again, require export pipelines.

Meanwhile, work continues on partial bitumen upgrading technology that would reduce the amount of diluent tying up pipeline space, leaving as much as one-third more room for the bitumen.

Oilsands producer MEG Energy Corp. says it has proposed but not yet approved funding for a partial upgrading facility that would not only reduce the need for diluent but also produce a partially upgraded product that would see greater demand when exported to U.S. refineries.

Tim McMillan, CEO of the Canadian Association of Petroleum Producers, says Canada needs to look at all options to get its oilsands products to market.

“Global demand for oil is going to increase dramatically out to the end of the International Energy Agency’s forecast and for every additional barrel we can get to market in a competitive way, Canada and the world will be better off,” he said.

“I think we need to look at partial upgrading and rail and increased pipe capacity, all of it.”

Companies in this story: (TSX:MEG)

MEG Energy Trans Mountain Pipeline

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Alberta, South Korea reach deal to eliminate three per cent tariff on crude exports
  • North Dakota oil production up 4,000 bpd in February vs January to 1,130,000 bpd – state regulator
  • Trump cites defense production act to sign energy-related memorandums
  • Trump cites defense production act to call for expansion of domestic petroleum production
  • PrairieSky Announces First Quarter 2026 Results

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.