• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Oilsands tailings pond approval terms shortened for former Shell facilities

May 23, 20182:47 PM The Canadian Press0 Comments

CALGARY – The Alberta Energy Regulator says it has approved tailings pond management plans for two former Shell Canada oilsands mines in northern Alberta but has identified “deficiencies” in the plans that must be addressed over the next three or four years.

The regulator says the plans associated with the mines are inadequate in dealing with existing fluid tailings ponds, their proposed reclamation plans are uncertain over the medium and long term and there are concerns about the proposed tailings treatment technology.

It says an amendment must be submitted by September 2021, by the current owner, Calgary-based Canadian Natural Resources Ltd., to address the Muskeg River mine plan’s shortcomings and by September 2022, for issues with the Jackpine mine’s plan.

It says Canadian Natural is proposing no bitumen production expansion at Jackpine, which means its end-of-life date is extended from 2052 to 2105, but that’s inconsistent with what was previously approved.

Tailings ponds, which are considered toxic to wildlife, are giant storage lakes used to separate oil, sand and chemicals from water used in oilsands ore transportation and processing.

Last October, the AER approved a tailings management plan for Suncor Energy Ltd.’s Millennium mine after it rejected its first application, although it said it was still concerned about the length of time it will take to remediate the ponds.

It added research, monitoring and reporting requirements to ensure efforts go ahead on schedule, but the Pembina Institute called Suncor’s plan unambitious and vague.

Last week, the three countries in the North American Free Trade Agreement agreed to vote on whether to investigate if Canada is failing to enforce environmental legislation on tailings ponds, a move required after the trade treaty’s environmental watchdog concluded there were serious questions about how the federal government enforces the Fisheries Act in relation to the giant ponds.

Companies in this article include (TSX:CNQ, TSX:SU)

Canadian Natural Resources Shell Suncor

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Brent oil tops $90 as US, Iran intensify attacks in Middle East
  • Few tankers enter Hormuz to load oil, data shows
  • Kuwait condemns what it calls Iranian attack on power, water desalination facility
  • Caspian Pipeline Consortium oil loadings suspended after drone attacks on tankers, CPC says
  • Iran’s Supreme Leader says US breaches show Trump’s signature is ‘worthless’

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.