• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Mazeppa Gas Plant Decommission and Equipment Salvage

September 6, 20183:10 AM BOE Report Staff

Millenia Engineering has been engaged to assist Grant Thornton Limited, solely in its capacity as the Receiver of Lexin Resources Ltd., 0989 Resource Partnership, 1051393 BC Ltd., LR Processing Ltd. and LR Processing Partnership with the sale of equipment and materials from the Mazeppa Gas Plant located at SE¼-35-019-28 W4M. The Receiver is soliciting interest to commence due diligence and submit a proposal or proposals for the purchase of equipment and materials in accordance with the terms and conditions of a Decommission and Equipment Salvage Request for Proposal package (the “RFP“).

The Mazeppa Gas Plant began operation in 1986.  The original plant was built to produce sales gas and condensate from 1202 E3m3/day (42 MMSCFD) of sour gas feed.  The plant consisted of, inlet separation and compression, gas treating (sulfinol), dehydration and dew point control, condensate stabilization, two sulphur recovery trains, liquid sulphur storage and loading, HC storage and loading, steam generation and utilities.  In 1998 a plant debottleneck increased the capacity to 2255 E3m3/day (80 MMSCFD).  In 2004 a 1267 E3m3/day (45 MMSCFD) sweet gas plant addition was completed.  This new facility included inlet separation, refrigeration, inlet compression, recycle compression, LPG storage and loading, new flare header and flare knockout.

Parties wishing to obtain a copy of the RFP and access to a secure Virtual Data Room containing documents that include a full description of the Bidder’s responsibilities, a detailed listing of equipment and materials PFD’s, PID’s and other associated drawings, should contact :

Millenia Engineering
Attn: Mark Ratte
mazeppaequip@milleniaeng.com
Phone No.: (403) 571 0510

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Russia’s Sechin says U.S. companies benefit from the closure of the Strait of Hormuz
  • Goldman Sachs says global oil demand takes big hit, sees risks to price forecast
  • US energy firms add rigs for seventh week in a row, says Baker Hughes
  • Companies to add 40 mln barrels of oil to US SPR after Iran war ends, energy secretary says
  • Global oil inventories depleted, next price spike could roil economies, markets

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.