• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Chevron seeks NEB licence that could nearly double production at Kitimat LNG

April 4, 20199:21 AM The Canadian Press0 Comments

CALGARY – Chevron Canada has applied to the National Energy Board to nearly double the potential size of the Kitimat LNG facility it hopes to build with Australian partner Woodside Energy.

In a filing dated Monday and posted on the NEB website, the Canadian branch of California-based giant Chevron Corp. says it is applying for a 40-year licence to export up to 28.23 billion cubic metres of natural gas per year, with commissioning of the facility taking place by 2029.

That’s the equivalent of about 18 million tonnes of liquefied natural gas and is nearly double the 10-million-tonne, 20-year licence it was previously granted, which is set to expire at the end of this year.

In a statement, the company says the increase in scope comes after a review that focused on improving the project’s “cost of supply competitiveness” relative to other LNG projects around the world.

The partners have not made a final investment decision, nor have they set a date to do so, but the expanded project is seen as another hopeful sign for B.C.’s nascent LNG industry after the LNG Canada consortium announced last fall it would proceed with its $40-billion, 14-million-tonne-per-year project, also to be built near Kitimat.

The new plan for Kitimat LNG envisions initially building two six-million-tonne production “trains” with the option to add a third later, as opposed to the original two-train proposal.

“Chevron’s application to the National Energy Board is a key regulatory undertaking and supports Chevron and Woodside’s desire to deliver a globally competitive Kitimat LNG project that is aligned with global LNG market demand, and which benefits British Columbians, First Nations and all Canadians,” Chevron said.

Chevron LNG

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Exxon, Chevron warn of continued high fuel prices from Iran war
  • ROK Resources Announces the Closing of its Non-Core Southeast Saskatchewan Asset Disposition
  • Chevron records highest quarterly profit in six years, beating analyst estimates
  • US energy firms add rigs for sixth time in seven weeks, says Baker Hughes
  • Canada’s Enbridge to postpone plans for second phase of Mainline oil pipeline expansion

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.