• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Keystone pipeline shut down for investigation of potential N.D. oil leak

October 30, 20191:55 PM The Canadian Press

keystone pipeline terminal

TC Energy Corp. says it has shut down the Keystone pipeline while it investigates a potential oil spill in North Dakota.

In a brief statement on Wednesday, the Calgary-based company says it is investigating a possible incident after detecting a drop in pressure near its facilities at Edinberg, N.D., at about 9:20 p.m. MT on Tuesday.

It says Keystone customers have been notified the pipeline will remain shut down while it investigates the incident.

According to The Associated Press, some wetlands appear to have been affected by the oil leak, but not any sources of drinking water.

There are no estimates of volume or how much land may have been affected.

A segment of the pipeline in Missouri was shut down in early February for nearly two weeks after a leak of about a dozen barrels of oil was discovered.

A 2017 spill from Keystone released almost 10,000 barrels of oil near Amherst, S.D.

TC Energy

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Western Energy Services Corp. announces second lien facility extension
  • New oil and gas jobs from BOE Report Jobs
  • Pulse Seismic Inc. Reports Q1 2026 Financial Results and Increases Regular Quarterly Dividend
  • HSBC sees limited near-term impact on OPEC+ from UAE’s departure
  • ARC Resources Ltd. reports first quarter 2026 results

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.