• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Enbridge says Minnesota concludes no additional risk to lake from pipeline

December 9, 20193:44 PM Reuters0 Comments

Canada’s Enbridge Inc said on Monday that a revised environmental statement from the state of Minnesota’s commerce department concludes that replacing the aging Line 3 oil pipeline would not introduce risks for Lake Superior in the case of a spill.

The revised statement was drafted at the request of the Minnesota Public Utilities Commission (PUC). A court had determined the previous environmental assessment was inadequate.

The commerce department’s spill modelling showed that oil from a spill would not reach the lake, Enbridge said.

The finding helps Enbridge’s chances of gaining final approval for the project from the Minnesota regulator and complete replacement of a pipeline built in the 1960s. The line moves crude from the Canadian province of Alberta to U.S. refineries, and replacing it would boost a Canadian oil industry that has struggled due to severe bottlenecks.

The project would double capacity to 760,000 barrels per day. Minnesota is the last link of Line 3 to be replaced, with the new Canadian portion opening this month.

“The PUC has produced yet another inadequate review that fails to recognize that this pipeline would pose an unacceptable risk to Minnesota’s clean water and should never be built,” said Margaret Levin, a director with the Sierra Club environmental activist group.

The commission said in a statement that it would conduct a public comment period until Jan. 16.

Enbridge

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Iran closes Strait of Hormuz over ceasefire violations – MEHR
  • Energy prices expected to push inflation higher for May, economists say
  • Suncor says fire that occurred at its Sarnia site has been extinguished
  • Oil shipments rise in Hormuz although questions grow over Iran’s transit terms
  • Iran says it plans meeting with US officials in coming days after postponing Friday talks

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.