• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Ottawa orders independent review panel for Suncor Energy oilsands mine extension

January 29, 20219:37 AM The Canadian Press0 Comments

CALGARY – Ottawa says it is referring the impact assessment of a Suncor Energy Inc. oilsands mine extension in northern Alberta to an independent review panel.

Minister of Environment and Climate Change Jonathan Wilkinson says the review is in the public interest given the extent to which the open pit project could adversely affect areas of federal jurisdiction, and considering concerns expressed by the public and Indigenous groups.

The Impact Assessment Agency of Canada is to work with the Alberta Energy Regulator to co-ordinate federal and provincial regulatory processes, including the potential for a joint review panel. Its next steps are to invite public and Indigenous comment on the draft impact statement guidelines and the public participation plan before finalizing both.

Suncor filed an application for the open pit mine development a year ago even though it said it won’t be needed until 2035 when the nearby existing mine that supplies its Base Plant is played out.

At the time, CEO Mark Little said filing early is “prudent” under the federal regulatory system, adding the project represents one of several options the Calgary-based company is considering and wouldn’t be officially approved for development for at least a decade.

In its project application, Suncor suggests construction would start as early as 2026 so that the mine could be operational by 2030.29dk2902l

Suncor

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Permian landowner EagleRock eyes $2.6 billion valuation in US IPO
  • UAE accuses Iran of attacking empty ADNOC oil tanker in Strait of Hormuz
  • Iran’s armed forces warn the US against entering Strait of Hormuz
  • Questerre closes sale of non-operated Kakwa Central assets for $23.5 million
  • OPEC+ crude output boost is symbolic, but it still matters: Russell

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.