• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

TC Energy seeks to recoup costs from U.S. for cancelled Keystone XL pipeline project

November 23, 202110:47 AM The Canadian Press0 Comments

Joe Biden

WASHINGTON – Pipeline giant TC Energy is formally seeking compensation from the U.S. government for the cancellation of the cross-border Keystone XL expansion project.

The Calgary-based company has officially filed a request for arbitration in its bid for “economic damages” resulting from President Joe Biden’s decision to cancel the project.

Cancelling the presidential permit issued by predecessor Donald Trump was one of Biden’s first decisions when he took office in January.

The decision effectively marked the end of a 13-year, on-again, off-again dispute that bedevilled three American presidents and two Canadian prime ministers.

In the process, Keystone XL became an enduring symbol for environmental activists determined to prevent what they considered a dangerous and damaging expansion of Alberta’s oilsands.

The company officially abandoned all hope for the expansion in June, and shortly afterward filed notice of its intent to seek compensation under the now-defunct North American Free Trade Agreement.

Its replacement, the U.S.-Canada-Mexico Agreement, allows companies to file legacy claims for lost investment under the terms of the previous deal.

“As a public company, TC Energy has a responsibility to our shareholders to seek recovery of the losses incurred due to the permit revocation, which resulted in the termination of the project,” the company said in a statement.

“We will not comment further and will follow the process as set out.”

Officials at the U.S. State Department and the office of U.S. Trade Representative Katherine Tai did not immediately respond to media requests on Tuesday.

Keystone XL TC Energy

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Brent oil tops $90 as US, Iran intensify attacks in Middle East
  • Few tankers enter Hormuz to load oil, data shows
  • Kuwait condemns what it calls Iranian attack on power, water desalination facility
  • Caspian Pipeline Consortium oil loadings suspended after drone attacks on tankers, CPC says
  • Iran’s Supreme Leader says US breaches show Trump’s signature is ‘worthless’

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.