• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

US to axe Biden-era 7-year deadline on exports from new LNG projects

April 1, 20252:19 PM Reuters0 Comments

The U.S. is slated on Wednesday to rescind a policy issued by the administration of former President Joe Biden that requires liquefied natural gas, or LNG, projects to export within seven years of receiving regulatory approval.

The LNG industry had pushed the administration of President Donald Trump to rescind the policy statement issued in April 2023 on Department of Energy approvals for exports to big markets in Europe and Asia because several projects require more than seven years to complete.

“Henceforth, DOE will consider applications to extend an authorization holder’s export commencement deadline and grant such extensions for good cause shown on a case-by-case basis, an approach consistent with DOE’s practice prior to the issuance of the Policy Statement,” said a document slated to be published in the Federal Register on Wednesday.

Tala Goudarzi, principal deputy assistant secretary of the Office of Fossil Energy and Carbon Management, said the Biden administration had made it unnecessarily difficult for projects to obtain and maintain an authorization to export LNG to non-free-trade-agreement countries.

Pipeline operator Energy Transfer in 2023 filed for a new export license for its proposed 16.45 million metric tons per annum Lake Charles LNG facility in Louisiana, after the DOE denied its request for a three-year extension to its old one, saying it did not meet the criteria.

Energy Transfer was not immediately available for comment.

Fred Hutchison, president and CEO of LNG Allies, a trade group, called the previous deadline policy inflexible and said the new policy marked a return to regular order.

“We are grateful that a commonsense approach has returned to the U.S. LNG export process,” Hutchison said.

(Reporting by Timothy Gardner Editing by Marguerita Choy and Leslie Adler)

LNG

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • OPEC further lowers 2026 global oil demand growth forecast
  • US to offer 81 million acres in Gulf of Mexico oil and gas lease sale
  • IEA slashes 2026 supply forecast as Hormuz reopening remains elusive
  • Oil rises as doubts over US-Iran deal heighten supply concerns
  • Hormuz shipping traffic falls to one-week low amid hostilities

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.