• Sign up for the Daily Digest E-mail
  • Facebook
  • X
  • LinkedIn

BOE Report

Sign up
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Malaysia to build 50% more gas-fired power capacity to meet data centre demand, official says

June 18, 20254:42 AM Reuters0 Comments

Malaysia is expected to add 6-8 gigawatts of gas-fired power by 2030 to address growing electricity consumption driven by demand from data centres, an industry official said.

The country is expected to see the fastest surge in data centre power demand in southeast Asia, with its share of electricity consumed by data centres in the region to triple to 21% by 2027 from 7% in 2022, a joint report in May by Bain & Co with others including Google and Temasek showed.

Rising gas demand could see Malaysia, the fifth-largest exporter of liquefied natural gas (LNG), start importing the super-chilled fuel in four to five years, the head of state energy firm Petronas told the Energy Asia conference this week.

Megat Jalaluddin, CEO of state utility Tenaga Nasional Berhad, said he expects Malaysia to add 6-8 gigawatts of gas-fired power by building new plants and extending the life of existing ones as it looks to cut dependence on coal.

That represents a 40-54% increase from the current 15 GW of gas-fired capacity. Total power consumption in Malaysia is on track to increase 30% by 2030, and Malaysia has already invited industry proposals for supply, he said.

“We want to phase out coal responsibly. Then the next best option that can basically take the place of coal is gas,” he told Reuters on the sidelines of the Energy Asia event.

Malaysia could also add as much as 10 GW of renewable capacity by 2030, more than doubling the 9 GW currently, as data centres push for access to cleaner sources of power, he said.

In the last two years, Malaysia has turned to its coal-fired power plants to address surging demand which grew at the fastest pace in 14 years in 2024, according to energy think-tank Ember.

Data centres are expected to require 19.5 GW of power generation capacity by 2035, accounting for 52% of Peninsular Malaysia’s electricity use, from about 2% now, Deputy Prime Minister Fadillah Yusof told Reuters.

Technology giants including Microsoft, Nvidia, Alphabet’s Google and ByteDance have announced billions of dollars in investments in Malaysia since the beginning of last year, powering an infrastructure boom.

Malaysia’s southern state of Johor has emerged as Southeast Asia’s hottest data centre hub due to its proximity to Singapore, relatively cheap land and power and faster approvals, real estate consultancy Knight Frank said in a report.

(Additional reporting by Michele Pek in Singapore Editing by Tony Munroe and Elaine Hardcastle)

LNG Petronas

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • New oil and gas jobs from BOE Report Jobs
  • Hemisphere Energy Announces Normal Course Issuer Bid Renewal
  • Trump says US to impose 50% tariff on copper imports, copper futures jump
  • Canada maps out widening strait to LNG riches
  • Discount on Western Canada Select narrows

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2025 Stack Technologies Ltd.