• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Group says it will continue blockade of Enbridge site indefinitely

August 6, 20142:00 PM The Canadian Press0 Comments

INNERKIP, Ont. – The group spearheading a blockade of an Enbridge pipeline construction site in southwestern Ontario is vowing to continue the protest.

Some 30 activists began their campaign early Tuesday near Woodstock at the site for the pipeline called Line 9.

The blockade dubbed Dam Line 9 is aimed at preventing installation of a valve near River Thames, which the protesters say isn’t adequately protected from the risk of a spill.

Protest spokeswoman Hannah Batten says the activists will remain at the site indefinitely.

Earlier, the group said talks were planned for Wednesday afternoon between Enbridge (TSX:ENB) and the protesters at the request of the company.

But Enbridge denies this, saying no one from the company has requested a meeting.

Line 9 carries crude oil between Sarnia, Ont., and Montreal.

Enbridge plans to reverse the flow of oil and increase the pipe’s capacity, but opponents argue the pipeline puts the environment at risk and there has been little consultation with aboriginal communities.

Enbridge has said Line 9 has a good safety record.

On site in southwestern Ontario, blockade of #Enbridge Line 9 is going strong! Follow http://t.co/sU996qfpad 4 more pic.twitter.com/E2RsWlrNM1

— Tar Sands Solutions (@TarSandsSolns) August 6, 2014

Enbridge Line 9

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Brent oil tops $90 as US, Iran intensify attacks in Middle East
  • Few tankers enter Hormuz to load oil, data shows
  • Kuwait condemns what it calls Iranian attack on power, water desalination facility
  • Caspian Pipeline Consortium oil loadings suspended after drone attacks on tankers, CPC says
  • Iran’s Supreme Leader says US breaches show Trump’s signature is ‘worthless’

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.