• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Enbridge pipeline reversal plan a threat to First Nations communities: lawyer

October 16, 201310:48 AM The Canadian Press

TORONTO – An Enbridge proposal to reverse the flow of a pipeline running between southern Ontario and Montreal puts First Nations communities at risk, a National Energy Board panel heard Wednesday.

Lawyer Scott Smith, representing the Aamjiwnaang First Nation and the Chippewas of the Thames First Nation, said the board has a duty to ensure the Crown adequately consults with his clients before making a decision on Enbridge’s Line 9 — a consultation he said hasn’t happened.

Calgary-based Enbridge (TSX:ENB) wants to reverse Line 9 and increase its capacity to move 300,000 barrels of crude oil per day through the line, up from the current 240,000 barrels.

Opponents of the Line 9 reversal claim the crude Enbridge wants to transport is more corrosive and will stress the aging infrastructure and increase the chance of a leak.

Enbridge has said that what will flow through the line will not be a raw oilsands product — although there will be a mix of light crude and processed bitumen.

But Smith said the reversal of the aging pipeline could negatively impact his clients, whose land lies near or over the pipeline.

“My clients’ central concerns are that repurposing Line 9 will increase the frequency and size of releases of crude oil following implementation of the project, and that such releases will cause large and more severe health, environmental and socio economic effects and corresponding infringement of their rights,” he told the three-member NEB panel Wednesday.

At hearings last week in Montreal, Enbridge counsel Douglas Crowther said the project will redeploy an existing pipeline in a safe, efficient and economical way to the benefit of refineries in Quebec, oil producers in Western Canada “and the broader Canadian public interest.”

Wednesday’s hearing in Toronto was briefly interrupted as it began by five masked protesters who silently held up anti-pipeline signs for about 10 minutes before leaving.

Line 9 originally shuttled oil from Sarnia, Ont., to Montreal but was reversed in the late 90s in response to market conditions, to pump imported crude westward. Enbridge is now proposing to flow oil back eastward to service refineries in Ontario and Quebec.

It says the 831-kilometre-long line is constantly monitored from an Edmonton control centre and can be shut down within 10 minutes if an unexplained reading comes in. A sudden loss of pressure means an automatic shutdown. The line is also patrolled on foot and by air.

If a leak occurs, a team can be on site in up to three hours, but the company is working to improve that by adding an emergency crew in Mississauga, Ont., to deal with problems in the Greater Toronto Area.

A portion of the line has already received approval for reversal and has been sending oil from Sarnia to North Westover, Ont. — about 30 kilometres northwest of Hamilton — since August.

Enbridge Line 9

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Fiddlehead Resources Corp. announces Q1 2026 financial results
  • Receivership Sales Process – Energera (Frac Shack™ and Sandtinel®)
  • Buffalo Potash Engages Rheaume Engineering for Initial Production Module Design At Flagship Disley Project
  • South Bow Announces Successful Open Season
  • Fed’s Schmid warns against viewing oil shock as transitory

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.