• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Enbridge reaches deal with Michigan on underwater Great Lakes pipeline

November 27, 201710:09 AM The Canadian Press0 Comments

Enbridge pipeline

CALGARY – Enbridge Inc. says it has reached a deal with the State of Michigan on the aging Line 5 pipelines that run along the bottom of a channel between Lakes Huron and Michigan.

The twin pipelines were laid in 1953 and have raised increasing concerns about the potential impacts on the Great Lakes if the 540,000-barrel-a-day pipeline were to leak.

The Calgary-based energy company (TSX:ENB) says the deal with the state includes completing an evaluation by June 2018 on three options to eventually replace the 7 kilometre stretch of underwater pipeline, as well as immediate safety measures to reduce the risk of a leak.

The replacement options include placing a new pipeline in a tunnel under the Straits of Mackinac, installing a new pipeline below the lakebed using advanced drilling techniques, and digging a trench on the bottom of the Great Lakes and then installing the pipeline within a secondary enclosure in the trench.

Opponents of the pipeline have called for its complete shutdown, with concerns on the condition of the pipeline increasing after Enbridge’s admissions in recent months that gaps had formed in its protective coating.

The company says the pipeline remains in good shape and is fit for service, and that it already operates it at less than 25 per cent of maximum pressure capacity for enhanced safety.

Enbridge

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Iran rejects idea of its assets being used to pay damages to US allies
  • Iran’s top negotiator threatens US targets over Lebanon escalation
  • Five things to watch for in the Canadian business world in the coming week
  • Russia’s Sechin says U.S. companies benefit from the closure of the Strait of Hormuz
  • Goldman Sachs says global oil demand takes big hit, sees risks to price forecast

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.