• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Appeal of NEB pipeline jurisdiction decision ‘highly probable’: B.C. activist

July 29, 201910:23 AM The Canadian Press0 Comments

CALGARY – B.C. environmental activist Mike Sawyer says it’s “highly probable” he will appeal a National Energy Board ruling that a pipeline designed to deliver natural gas to the $40-billion LNG Canada project falls under provincial, not federal, jurisdiction.

The NEB ruled Friday against Sawyer’s application which contended the $6.2-billion Coastal GasLink project proposed by TC Energy Corp. falls under federal jurisdiction because it will connect with the Nova Gas Transmission Ltd. pipeline system of northeastern B.C. and northwestern Alberta and therefore crosses a provincial boundary.

The NEB found that the pipeline is not under its jurisdiction because it does not form a part of the Nova system and is not “vital or integral” to it or any other federally regulated pipeline.

It said Coastal GasLink, a 670-kilometre conduit currently under construction, is properly authorized and regulated by the British Columbia Oil and Gas Commission. The line is to bring gas from the Groundbirch area of British Columbia to LNG Canada’s export terminal near Kitimat, B.C.

Sawyer says he is in discussions with his lawyer about whether to appeal the decision to the Federal Court of Appeal, as he did after the NEB made a similar decision on the Prince Rupert Gas Transmission pipeline that was to supply the Pacific NorthWest LNG project.

In that case, the appeal court sent the ruling back to the NEB for reconsideration in 2017, but the question was left unanswered when the LNG project and its pipeline were abandoned.

In a brief statement on its website, Coastal GasLink said it is “pleased” with the NEB ruling.

Companies in this story: (TSX:TRP)

TC Energy

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Russia says it’s maintaining oil supplies but has no new OPEC+ initiatives
  • Welcome to the age of energy shocks: Bousso
  • Iran continues crude exports despite US blockade, Vortexa says
  • Iran tightens control of Hormuz after US calls off renewed attacks
  • China’s LNG imports plunge, helping Asia adjust to Iran war losses: Russell

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.