• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Oilsands production growth cut despite lower building costs in CERI forecast

July 30, 20192:35 PM The Canadian Press0 Comments

CALGARY – Growth in oilsands production over the next 20 years is expected to be slower than previously forecast, despite falling project construction costs, according to a study update by the Canadian Energy Research Institute.

Total oilsands output is expected to grow from about three million barrels per day in 2018 to between 4.1 million and 5.8 million bpd in 2039, based on low and high growth scenarios presented by the Calgary-based think-tank.

In its reference or base case, CERI predicts bitumen crude output will grow to about 4.7 million bpd over the next 20 years, at an average rate of 80,000 bpd or just over two per cent per year — down from last year’s estimate of three per cent annual growth.

“We’re looking at demand for oil internationally, the cost profile for oilsands in Canada and our assumption that three new pipelines will be built,” said Allan Fogwill, CEO of the research institute.

The analysis assumes there will be sufficient growth through pipelines such as the Trans Mountain expansion, Keystone XL and Line 3, as well as incremental expansions of existing pipelines and crude-by-rail, to meet demand, he said.

Overall capital spending will average $16.5 billion per year, CERI calculates, but notes risk factors include the recent tendency of the industry to defer or cancel projects, the chance of further success in cutting costs, uncertainty about whether Alberta’s 100-megatonne cap on sector greenhouse gas emissions continues and the unknown future of export oil pipelines.

CERI says the slower growth will result in the industry staying well within the emissions cap, reaching 94 megatonnes by 2039 — under last year’s forecast, the cap would have been reached by 2030.

Meanwhile, the cost of building a new steam-driven oilsands project has fallen by 11 per cent to C$40.61 per barrel of production, while an expansion project’s cost has fallen by six per cent to C$27.60 per barrel, the study says.

“At current (West Texas Intermediate) prices of around US$60 per barrel, these projects are decidedly economic,” the report notes.

“The relative position of oilsands projects against other crude oils is comparatively competitive and, as oil prices are expected to increase, so will the profitability of oilsands projects.”

Follow @HealingSlowly on Twitter.

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Journey Posts $25.9 Million of Net Income and $71.0 Million of Adjusted Funds Flow for 2025
  • Pulse Seismic Inc. Receives TSX Approval for Normal Course Issuer Bid and Enters Into Automatic Share Purchase Plan
  • Discount on Western Canada Select widens
  • Saturn Oil & Gas Inc. Announces 2025 Results and Reserves, With $110 Million of Debt Repayment, Record Q4 Production Ahead of Guidance and 50% Free Funds Flow Yield
  • Birchcliff Energy Ltd. Announces the Filing of its Audited Financial Statements and Other Disclosure Documents for the Year Ended December 31, 2025 and Provides Operational Update

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.