• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Suncor Energy reviews mining safety after three workers killed

February 4, 20219:22 AM Reuters0 Comments

Canada’s second-biggest oil company, Suncor Energy Inc, said on Thursday it had started a third-party safety review after three contract workers died in two separate mining accidents.

Chief Executive Mark Little said the review would focus on mining operations, which are one of the ways the company extracts crude from Alberta’s oil sands. It is scheduled for completion this quarter.

“As devastating as this has been for all of us, I can’t even comprehend how difficult this is on the families,” Little said, before pausing the quarterly conference call to hold a moment of silence for the workers.

A man died last month when a bulldozer he was driving fell through the ice of a tailings pond at Suncor’s base mine near Fort McMurray, Alberta.

In December, a bulldozer hit a truck at the Fort Hills, Alberta, site, killing two workers.

Alberta’s occupational health and safety department is investigating both incidents.

They follow accidents during construction of Trans Mountain Corp’s oil pipeline expansion, causing it to halt work temporarily.

Suncor on Wednesday said it narrowed its fourth-quarter loss on cost-saving measures.

Even as oil prices rise, Little ruled out any increase to 2021 capital-spending plans, a range of C$3.8 billion ($2.96 billion) to C$4.5 billion. Suncor has restarted work on its cogeneration project, which will replace coke-fired boilers with natural gas units at its base operations, and its Forty Mile wind farm in Alberta.

Two-thirds of additional funds from rising prices will repay debt, while one-third will buy back shares, Chief Financial Officer Alister Cowan said.

Suncor sold its 27% stake in the Golden Eagle fields for $325 million to North Sea oil producer EnQuest. 29dk2902l

Suncor

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Discount on Western Canada Select unchanged
  • US loans 8.5 million barrels of SPR oil in second batch since Iran war
  • US drillers cut oil and gas rigs for third time in four weeks, Baker Hughes says
  • UK to convene more talks on Strait of Hormuz next week, official says
  • Ovintiv to Host its First Quarter 2026 Results Conference Call and Webcast on May 12, 2026

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.