• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

US Army Corps grants emergency status for Enbridge Line 5 tunnel

April 16, 20258:54 AM Reuters0 Comments

Enbridge pipeline The U.S. Army Corps of Engineers on Wednesday granted Enbridge’s proposed tunnel for its Line 5 pipeline national energy emergency status, fast-tracking a key federal permitting process.

President Donald Trump had ordered the Army Corps to issue permits enabling the filling of wetlands and dredging or building in waterways as part of the January 20 emergency energy declaration, which was aimed at expanding U.S. energy production to meet projected soaring demand.

The Army Corps, a federal engineering service, has permitting authority over projects involving wetlands and waterways.

In its public notice, the Army Corps’s Detroit district said the emergency permit request met the terms of Trump’s executive order because it addresses “an energy supply situation which would result in an unacceptable hazard to life, a significant loss of property, or an immediate, unforeseen, and significant economic hardship” if not acted upon more quickly.

Michigan regulators had approved Enbridge’s application to build a $750 million tunnel under the Great Lakes to house its aging Line 5 oil pipeline in 2023, but the project had awaited Army Corps permitting.

The Army Corps had been conducting an environmental impact study of the pipeline with input from affected Native American tribes.

The Army Corps had initially posted in February a list of more than 600 projects requiring faster environmental approvals, but then quickly removed the list from its website to give the agency more time to vet projects.

(Reporting by Valerie Volcovici; Editing by Chizu Nomiyama)

Enbridge

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • New oil and gas jobs from BOE Report Jobs
  • Goldman Sachs says US natural gas output shows signs of price sensitivity
  • Alberta’s timing targets for West Coast pipeline ‘best-case scenario’: CIBC analysts
  • Some of the biggest power companies in US
  • ConocoPhillips expects Qatar gas JVs delays of months, not years

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.