• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Shell-led LNG Canada faces problems as it ramps up production, sources say

July 29, 20255:49 PM Reuters0 Comments

Shell-led LNG Canada is experiencing technical problems as it ramps up production at its liquefied natural gas plant at Kitimat, with one LNG tanker diverting away from the facility without the superchilled fuel in recent days, according to four sources and LSEG ship tracking data.

The plant is the first major LNG export facility in Canada and the first on the west coast of North America, providing direct access to Asia, the world’s largest LNG market.

The facility is expected to convert about 2 billion cubic feet of gas per day (bcfd) to LNG when fully operational, which market participants have hoped will boost Canadian natural gas prices.

Western Canadian natural gas prices remain depressed, however, due to a persistent supply glut that has not yet been drawn down by fresh demand from LNG Canada’s July 1 startup.

The daily spot price at the Alberta Energy Company (AECO) storage hub closed at $0.22 per mmBtu on Tuesday, compared to the U.S. Henry Hub benchmark price of $3.12, according to LSEG data.

LNG Canada, which took almost seven years to be built, has been operating at less than half the capacity of its first plant, also called a train, two of the four sources said.

The facility’s Train 1 has experienced technical issues with a gas turbine and with a Refrigerant Production Unit (RPU), according to two other industry sources.

The sources all spoke on condition of anonymity because the information was not public.

In response, a LNG Canada spokesperson said a new-build facility at the joint venture’s size and scale may face operational setbacks as it ramps up production and stabilizes.

There has been at least one diversion by Shell of an empty LNG vessel to Peru, while other tankers remain close to the facility, LSEG ship tracking data showed.

Ferrol Knutsen, a 170,520 cubic meters LNG tanker, was signaling that it was headed to the Kitimat port but then changed directions and is now off the coast of California on its way to Peru, according to LSEG ship tracking data.

LNG Canada is a joint venture between Shell, Malaysia’s Petronas, PetroChina, Japan’s Mitsubishi Corp and South Korea’s KOGAS.

When fully operational, LNG Canada will have a capacity to export 14 million metric tonnes per annum (mtpa), according to company statements.

So far the facility has exported four cargoes, including its first shipment on July 1. Another shipment is expected in the coming days, the LNG Canada spokesperson said.

The pace of exports from the plant will increase as it moves through early operations and into a steady shipping cadence, the spokesperson said.

“In regular operations in Phase 1, we anticipate loading one export cargo from our facility every two days,” the spokesperson added.

(Reporting by Marwa Rashad in London, Curtis Williams in Houston and Amanda Stephenson in Calgary; Editing by Liz Hampton and Jamie Freed)

LNG PetroChina Petronas Shell

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • US intelligence warns Iran unlikely to ease Hormuz Strait chokehold soon, sources say
  • Iran targeted ‘enemy’ aircraft near Hormuz strait, state media says
  • Tehran rejected 48-hour ceasefire proposal from US, Iranian media, citing source, says
  • Trump says US can take Strait of Hormuz with more time
  • Europe must prepare for ‘long-lasting’ energy shock, EU energy commissioner tells FT

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.