• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Phillips 66, Kinder Morgan move ahead with new US West Coast fuel pipeline

April 20, 20268:43 AM Reuters0 Comments

Steel long pipes in crude oil factory during sunset Phillips 66 and Kinder Morgan have secured enough long-term shipper commitments to move forward with a proposed pipeline project to supply fuel to Arizona and California, they said on Monday.

The Western Gateway Pipeline project comes as companies race to build a major new fuel pipeline to the U.S. West Coast ahead of planned refinery closures in California, a relatively isolated fuel market with limited pipeline links to major refining hubs, leaving it vulnerable to supply disruptions and price spikes.

Phillips 66 and Kinder Morgan began seeking initial shipper commitments in October for the proposed pipeline system that would carry fuel from a Texas refining hub to Arizona and California.

The companies have not disclosed the cost of the project.

The refined products pipeline system is designed to link Midwest and Gulf Coast refinery supply to Phoenix, Arizona, and California markets, with connectivity to Las Vegas through Kinder Morgan’s CALNEV Pipeline.

The project includes a new pipeline from Borger, Texas, to Phoenix, as well as the reversal of Kinder Morgan’s existing pipeline between Colton, California, and Phoenix to allow east-to-west flows into California. Phillips 66’s Gold Pipeline, which currently runs from Borger to St. Louis, will also be reversed to supply the system.

The project is slated to begin service in mid-2029.

(Reporting by Dharna Bafna in Bengaluru; Editing by Sahal Muhammed)

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Airfares climb for first time in nearly two years amid soaring fuel costs: StatCan
  • Alberta caribou habitat gets a boost with surging revegetation of legacy seismic lines
  • Iran ‘positively’ reviewing US peace talks participation; no decision yet, official says
  • Superior Plus shares up more than 10 per cent after signing data centre deal
  • Kuwait declares force majeure on oil shipments amid Hormuz blockade, Bloomberg News reports

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.