• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

US natgas flows to Freeport LNG in Texas seen at 16-week high, LSEG data shows

May 9, 20248:09 AM Reuters0 Comments

Natural gas flowing to Freeport LNG’s export plant in Texas was on track to hit a 16-week high on Thursday, LSEG data showed, in what energy traders said was a sign it could return to full power soon.

The startup and shutdown of Freeport and other U.S. liquefied natural gas (LNG) export plants often has a major impact on global gas prices.

U.S. gas futures at the Henry Hub benchmark in Louisiana have soared by around 38% over the past nine days due in part to the increase in feedgas from Freeport after it exited an outage in late April.

U.S. gas futures were trading at a 14-week high of $2.23 per million British thermal units (mmBtu) on Thursday.

With Freeport back in service, total feedgas flowing to the seven big U.S. LNG export plants rose to 12.4 billion cubic feet per day (bcfd) so far in May, up from an average of 11.9 bcfd in April, LSEG data shows. That compares with a monthly record of 14.7 bcfd in December.

The amount of gas flowing to the 2.1-bcfd Freeport plant was on track to rise to 1.7 bcfd, the most since Jan. 14. That is up from an average of 1.3 bcfd over the past week and 0.4 bcfd in April.

Energy traders said it looked like all three trains at the Freeport plant were operating – at least at low levels – due to the amount of feedgas currently flowing to it.

Officials at Freeport had no comment on the increase in feedgas.

Each of the plant’s three liquefaction trains can turn about 0.7 bcfd of gas into LNG.

One billion cubic feet is enough gas to supply about 5 million U.S. homes for a day.

In late March, Freeport said it expected two of the three liquefaction trains, Trains 1 and 2, to remain shut until May for inspections and repairs, while Train 3 was operating.

However, Train 3 shut, at least temporarily, around April 11.

(Reporting by Scott DiSavino; Editing by Alexander Smith)

LNG

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • New ‘green island’ to grow in Alberta’s Industrial Heartland
  • Trump cancels strikes against Iran planned for Thursday evening
  • AltaGas in talks with more Asian customers to supply fuels from B.C. terminal: CEO
  • A look at Iran’s Kharg Island and energy sector
  • Iran war adds to AI boom as demand for gas turbines rises further, Siemens Energy says

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.